A key player in the Scottish Whisky sector required enhanced light levels at their tanker fill station. At the same time they wanted to optimise energy consumption for what is a 24hr process
To meet the client’s requirements Ecolighting Systems produced a lighting scheme in conjuction with the Glasgow based contractor, McArthurs Renewables. We utlised the single and twin wing Zone 2 LED high bays from the nD8300 range. https://www.schuch.de/en/products/ex-protected/174287. These fittings deliver exceptional light to power and the use of enhanced optics meant maximum energy efficient light was delivered to the key areas of activity while minimising local light pollution